Instrument Cluster Housing Replacement

Document Preview

07 GMT023 IP Upper Extension

Callout

Component Name

1

Instrument Panel Cluster Housing

Procedure

Grasp the cluster housing and pull outward releasing it from the instrument panel.

2

Retainer Clips (Qty:‚ÄČ4)

Attention!

To view the rest of this document requires a subscription. Subscriptions start at only $15.00. Click the button below to view the subscription options and to sign up.

Subscribe

Notice!

You may preview the service manual table of contents by clicking below.

Service Manual Table of Contents